Tel +49 (0)351 658 774 – 0 Fax +49 (0)351 658 774 – 14
SAUTER BIOGAS GmbH
Am Berg 1b – 01665 Klipphausen

Practice-oriented!

Our motivation in plant engineering for over 10 years has been:

 

Every technological process can sometimes be interrupted, but the essential plant operation (gas production and gas utilization) must continue! Therefore, the technology of our system - in case of possible malfunctions - is always easily accessible!

An important advantage of our Sauter biogas system: Sprinkled not stirred!

The development and implementation of trend-setting concepts for regenerative energy generation, agriculture and waste management is our passion!

COMPONENT-FREE DIGESTER

» Optimal safety – low maintenance

» All system components are located outside the digester for easy access and reduced downtime.

ALL SUBSTRATES ARE USABLE

» From slurry to 100 % manure to grass.

» A biomass storage bunker for the solids feeder is not necessary!

LOW ENERGY CONSUMPTION

» Our irrigation system requires less energy than agitation mixers or mixing jets.

BIOGAS IS OUR FOCUS

FOR OVER 20 YEARS WE HAVE BEEN INVOLVED IN THE DEVELOPMENT OF EFFICIENT BIOGAS PLANTS

 

How can agricultural waste products be utilized profitably? Stefan Sauter (shareholder & managing director) and Norbert Sauter (shareholder) of Sauter Biogas GmbH, were presented with this question from an early age. Since the late 1980’s, their parents – having run a farm successfully – had devoted their attention to biogas utilization. This was an inspiration to the brothers. The theory and practice of the generation of biogas has been a solid part of their lives ever since. The Sauter farm has been operating its own biogas plant since 1992.

Based on their own experience with stirring systems, the brothers set out to achieve the goal of developing a digester without internal technical components. Driven by this idea, numerous experiments followed. Simultaneously the Sauter’s developed a vision: Residues of many different types should be able to be processed using this technology.

Following years of research, the first biogas plant with the groundbreaking and patented‚ ’Sprinkled, not stirred!’ system was set up in 2006. Since then, Sauter Biogas GmbH has built 50 plants from 75 kW to 4 MW in Europe, America, Africa and Asia – 42 of them are in Germany (Sep. 2019).

Our Team

For the last 10 years we are a well-functioning team with a healthy growth in active employees, as well as stable partnerships in plant construction. This is the root of our common success, and we are proud of it.